Overview

A plant you cannot see is a plant you cannot trust. We instrument treatment trains end to end, integrate them into SCADA, and watch them around the clock from our operations hubs. We act on trends before they become alarms.

Parameters

pH, ORP, turbidity, conductivity, TOC, flow, pressure

Integration

Open protocols, existing SCADA

Cover

24/7 from three operations hubs*

Reporting

Automated compliance reports

Security

Segmented OT network, read-only by default

* Illustrative template values

How it works

The treatment train.

Each stage is sized on your water, not a catalogue. The sequence below is typical; every design is confirmed by sampling and, where useful, pilot trials.

01

Instrumentation

02

Control & SCADA

03

Data platform

04

Remote operations

05

Optimisation

Why AQUARC

What you get that a catalogue doesn’t.

01

Early warning

Trend-based alerts flag membrane fouling and dosing drift days in advance.

02

Fewer site visits

Remote diagnosis resolves most issues without a truck roll.

03

Audit-ready

Every reading time-stamped and stored for compliance reporting.

04

Continuous tuning

Monthly optimisation reviews lower energy and chemical use.

FAQ

Common questions, answered.

Skid-mounted systems typically take 6–9 months from order to handover; built-in-place plants 14–30 months.*

Yes. Containerised pilot units can be on site within weeks to confirm design assumptions on your real water.

Process performance guarantees on quality and capacity as standard, and availability guarantees under O&M contracts.

We design for expansion by default: footprint, tie-ins and electrical capacity are reserved for the next train.

Create a free website with Framer, the website builder loved by startups, designers and agencies.