Overview

Industrial effluent changes by the hour. We design treatment that absorbs shock loads, recovers what it can and discharges reliably within consent. Delivery runs from feasibility through to performance testing.

COD removal

90–98%*

Capacity

200–60,000 m³/d*

Processes

DAF, MBBR, MBR, SBR, UF

Sludge

Thickening, dewatering, drying

Delivery

EPC, EPCM or design-only

* Illustrative template values

How it works

The treatment train.

Each stage is sized on your water, not a catalogue. The sequence below is typical; every design is confirmed by sampling and, where useful, pilot trials.

01

Equalisation

02

DAF / clarification

03

Biological (MBBR / MBR)

04

Tertiary filtration

05

Sludge handling

Why AQUARC

What you get that a catalogue doesn’t.

01

Shock-load resilient

Equalisation and buffer capacity sized on real production data, not averages.

02

Compact footprints

MBR and MBBR options where space is the hardest constraint on site.

03

Resource recovery

Biogas, nutrients and heat recovery assessed on every project.

04

Consent confidence

Online compliance monitoring with alarms before limits, not after.

FAQ

Common questions, answered.

Skid-mounted systems typically take 6–9 months from order to handover; built-in-place plants 14–30 months.*

Yes. Containerised pilot units can be on site within weeks to confirm design assumptions on your real water.

Process performance guarantees on quality and capacity as standard, and availability guarantees under O&M contracts.

We design for expansion by default: footprint, tie-ins and electrical capacity are reserved for the next train.

Create a free website with Framer, the website builder loved by startups, designers and agencies.