Overview

Most of a plant's life happens after handover. Our O&M teams run treatment works under performance contracts, with planned maintenance, spares strategy and operator training included. Results are reported every month.

Contracts

1–15 years

Guarantees

Output, quality and availability

Availability

≥ 99.2% contracted*

Teams

Resident or visiting operators

Training

Accredited operator programmes

* Illustrative template values

How it works

The treatment train.

Each stage is sized on your water, not a catalogue. The sequence below is typical; every design is confirmed by sampling and, where useful, pilot trials.

01

Plant audit

02

Mobilisation

03

Planned maintenance

04

Performance reporting

05

Upgrades & renewal

Why AQUARC

What you get that a catalogue doesn’t.

01

Guaranteed output

Contracts tied to quality, volume and availability, with penalties for missing them.

02

Lifecycle thinking

Maintenance planned around asset condition, not the calendar.

03

People on site

Experienced operators who know the plant as well as the people who designed it.

04

Transparent reporting

A monthly performance report, in plain language and with the data behind it.

FAQ

Common questions, answered.

Skid-mounted systems typically take 6–9 months from order to handover; built-in-place plants 14–30 months.*

Yes. Containerised pilot units can be on site within weeks to confirm design assumptions on your real water.

Process performance guarantees on quality and capacity as standard, and availability guarantees under O&M contracts.

We design for expansion by default: footprint, tie-ins and electrical capacity are reserved for the next train.

Next solution

Create a free website with Framer, the website builder loved by startups, designers and agencies.