Water reuse

Zero liquid discharge: when it makes sense

9 Aug 2026

·

8 min

read · AQUARC Engineering

ZLD is powerful and expensive. A practical guide to deciding whether your site needs it, or just needs high recovery.

The last 5% is the hardest

Taking reuse from 90% to 100% often costs as much as everything before it. Brine concentrators and crystallisers are energy-intensive and demand skilled operation.

When ZLD is right

ZLD makes sense where discharge is impossible or prohibitively regulated, or where the salts themselves have value. Elsewhere, high-recovery RO with responsible brine management is usually the better answer.

Designing for later

If ZLD may be needed in the future, design for it now: leave the footprint, the electrical capacity and the tie-ins.